Peach Bottom Atomic Reactor
Abstract/Description: | Fuel loading of the Peach Bottom atomic reactor began on February 5, 1966. Philadelphia Electric employees inspect one of the 804 fuel elements placed in the core, as it is lowered into a pick-up cell. |
---|---|
Subject(s): | Equipment and supplies U.S. Atomic Energy Commission |
Date Created: | circa 1966 |
Credit Line: | Exelon Corporation, courtesy AIP Emilio Segrè Visual Archives, Physics Today Collection |
Catalog ID: | Atomic Energy Commission F15 |
Title: | Peach Bottom Atomic Reactor . |
|
---|---|---|
Type of Resource: | still image | |
Date Created: | circa 1966 | |
Extent: | 1 photographic print (black and white; 8 x 10 inches) | |
Abstract/Description: | Fuel loading of the Peach Bottom atomic reactor began on February 5, 1966. Philadelphia Electric employees inspect one of the 804 fuel elements placed in the core, as it is lowered into a pick-up cell. | |
Identifier(s): | Atomic Energy Commission F15 (Catalog ID) | |
Note(s): |
Credit Line: Exelon Corporation, courtesy AIP Emilio Segrè Visual Archives, Physics Today Collection |
|
Subject(s): |
Equipment and supplies U.S. Atomic Energy Commission |
|
Held by: | Niels Bohr Library & Archives | |
Related Title: | Physics Today Collection. | |
In Collections: |