Attachment of instrumentation guide tubes to simulated fuel core assemblies

Attachment of instrumentation guide tubes to simulated fuel core assemblies was examined in the Fast Flux Test Facility (FFTF) before closure of the reactor vessel.  The simulated assemblies will be removed when actual fuel is inserted in the FFTF after construction completion in 1978., Credit Line: Battelle-Northwest Photo, courtesy AIP Emilio Segrè Visual Archives, Physics Today Collection
Abstract/Description: Attachment of instrumentation guide tubes to simulated fuel core assemblies was examined in the Fast Flux Test Facility (FFTF) before closure of the reactor vessel. The simulated assemblies will be removed when actual fuel is inserted in the FFTF after construction completion in 1978.
Subject(s): Equipment and supplies
Breeder reactors
Particle accelerators
Richland (Wash.)
Breeder Reactors
Date Created: circa 1976
Credit Line: Battelle-Northwest Photo, courtesy AIP Emilio Segrè Visual Archives, Physics Today Collection
Catalog ID: Breeder Reactors F23